A comparable sheet metal chassis quote states the drawing revision, formed dimensions, material and thickness, quantity, finish and delivery scope. Ask each supplier to separate fixed preparation, recurring fabrication and the items charged separately.

What to put on the quote sheet
- Stock or customer-supplied blanks, with material grade, thickness and usable yield stated.
- Cutting and forming, plus any hardware, welds, deburring and finish.
- First-piece review, assembly fit checks, inspection records, packaging and freight.
- Currency, quote date, validity period, lead-time trigger and exclusions.
See how quantity affects an otherwise identical chassis
Illustrative arithmetic in cost units. Assume one setup charge of 80 and a repeat cost of 12 per identical chassis for the same scope and revision. At ten pieces the total is 200, or 20 per piece. At forty pieces the total is 560, or 14 per piece. A production quote may change unit labor, material yield or packaging across tiers, so ask which assumptions actually changed.
Send assembly and part drawings together
Include formed size, a flat pattern if available, hole locations, bend notes, the hardware list and approved finish. Mark the surfaces that locate the assembly. Ask whether it is a bare fabrication or whether coatings and installation of supplied hardware are included. See the chassis process guide.
Copy a scope sheet into each quote request
Use one line for each of drawing revision, alloy and thickness, quantity, forming, hardware, finishing, inspection, packing and destination. Ask suppliers to identify included items and list one-time preparation and per-unit charges separately. Place currency, quote validity, tax treatment and delivery terms on the same sheet. Add a line for first-piece approval and who supplies a mating cover. A comparable quote attaches the same part and assembly drawings to every quantity tier.
